Elation IP Gobo Rotator handleiding

18 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 13 van 18
13
ROTATOR INSTALLATION
3. Remove rubber cover from the bottom of the fixture.
4. Position the rotator housing facing the front of the profile fixture, then install it into the
GOBO slot. Make sure it is fully seated and the rear radiused stop is flush with the
fixture shroud surface. Secure the 2 screws on fixture top GOBO slot cover.
5. Remove the IP65 rubber covers of the 5pin power/data linking connection on the
bottom of the rotator and on the profile fixture.
6. Connect the included 5pin power/data linking cable.
Front
Back
Radiused
Stop

Bekijk gratis de handleiding van Elation IP Gobo Rotator, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkElation
ModelIP Gobo Rotator
CategorieVerlichting
TaalNederlands
Grootte5877 MB