Eibenstock PLE 182 handleiding

144 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 111 van 144
14
Fastening by means of dowels in concrete
Fastening on the floor by means of vacuum
Don’t use the vacuum mounting on the wall and overhead!
For a low-pressure mounting the surface where the base is mounted must be
not porous and must be flat and free of cracks.
If this is not the case, this kind of mounting can’t be used. For the vacuum
mounting you need a vacuum pump, a vacuum hoses and the vacuum set BST
182 V/S (see fig.). These items are available on request.
Mark the position of the drill holes for the
fastening on the surface to be drilled.
Drill a hole (Ø 15) 50 mm deep (A), into which
the dowel M12 (B) is to be placed; insert and
secure the dowel with the doweling tool (C).
Screw the quick action clamping screw (D) into
the dowel.
For brickwork, Rawl-Dowels must
be used (drillhole - Ø 20mm).
Install the drill rig.
Fix the washer (E) and finally the
fastening nut (F) on the quick action
clamping screw (D).
Tighten the fastening nut (F) with a
wrench SW 27.
Before and after tightening the nut (F),
the 4 adjustable screws have to be
adjusted in order to adapt the rig to the
surface.
Do check whether the drill rig is
installed safely and firmly.
E
F
D
A
B
C
D

Bekijk gratis de handleiding van Eibenstock PLE 182, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkEibenstock
ModelPLE 182
CategorieNiet gecategoriseerd
TaalNederlands
Grootte19223 MB