Eaton Green Motion XCI000411 handleiding
Handleiding
Je bekijkt pagina 46 van 107

Green Motion Building EV chargers can be connected to building energy meters to enable dynamic load balancing. The EV
charger communicates with an energy meter over the Modbus TCP/IP protocol. The following energy meters are pre-configured
for use with Green Motion Building EV chargers and are therefore recommended:
6.9 Connection to an external energy meter
Table 14. Recommended energy meters
Manufacturer Model
Janitza • UMG 96 RM
• UMG604-E
Carlo Gavazzi • EM24DINAV53XE1X
• EM24DINAV23XE1X (65 A)
Eastron SDM630-TCP (65A) Rail DIN
The energy meter must be directly connected to the Master EV charger or visible on the EV chargers local network.
Refer to section 8 for more details.
Energy meters should be configured before use based on the installation site and network settings. Check the
manufacturer’s instructions for detailed configuration steps.
Verify the meter readings and the connection to the energy meter independently before connecting to the
EV charger.
The application note to assist in configuring the energy meters mentioned in Table 14 is also available on the
product page.
46
GREEN MOTION BUILDING INSTALLATION MANUAL MN191028EN April 2024 www.eaton.com
Bekijk gratis de handleiding van Eaton Green Motion XCI000411, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Eaton |
Model | Green Motion XCI000411 |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 16416 MB |