Duromax XP11000iHT handleiding
Handleiding
Je bekijkt pagina 63 van 86

63
Date Generator Hours Maintenance Performed
Maintenance Log
As a best practice it’s recommended to keep a log of the generator hours and maintenance to
ensure your generator is always operating to its full potential.
Break-In Period
As the best practice for any new combustion motor it’s recommended to perform the break-
in procedure as follows:
● Run the generator for the rst 6-8 hours on conventional oil, then change the oil. After
the break-in period synthetic oil may be used.
● During the break-in period of the rst 6-8 hours keep the generator load under 50%
for optimal results.
● Check and clean the air lter if necessary after the break-in period.
Bekijk gratis de handleiding van Duromax XP11000iHT, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Duromax |
| Model | XP11000iHT |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 37294 MB |