Deye SUN-15K-SG01HP2-US-AM2 handleiding

54 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 15 van 54
- 13 -
3.4 Grid connecon and backup load connecon
1. Before making Grid, load and Gen port connec�on, be sure to turn off AC breaker or
disconnector first.
2. Remove insula�on sleeve 10mm length, insert the wires according to polari�es indicated on
the terminal block. Make sure the connec�on is complete.
Please follow below steps to implement Grid, load and Gen port connecon:
· Before connec�ng to the grid, a separate AC breaker must be installed between the inverter
and the grid, and also between the backup load and the inverter. This will ensure the inverter
can be securely disconnected during maintenance and fully protected from over current. For
the 8/10/12/15kW model, the recommended AC breaker for backup load is 100A. For the 8/10
/12/15kW model, the recommended AC breaker for grid is 100A.
All wiring must be performed by a qualified personnel.It is very important for
system safety and efficient opera�on to use appropriate cable for AC input
connec�on. To reduce risk of injury, please use the proper recommended cable
as below.
· There are three terminal blocks with "Grid" "Load"and "GEN" markings. Please do not misconnect
input and output connectors.
Chart 3-3 Recommended Size for AC wires
Grid connec�on and backup load connec�on (Copper wires) (bypass)
Grid connec�on and backup load connec�on (Copper wires)
Model
8/10/12/15kW
Wire Size Cable(mm )
2
Torque value(max)
3/0AWG 85 4.5Nm
Model Wire Size Cable(mm )
2
Torque value(max)
8kW 4AWG 21.1 3.4Nm
10kW 2AWG 33.6 3.4Nm
12kW 1AWG 42.4 4.0Nm
15kW 2/0AWG 67.4 4.0Nm

Bekijk gratis de handleiding van Deye SUN-15K-SG01HP2-US-AM2, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkDeye
ModelSUN-15K-SG01HP2-US-AM2
CategorieNiet gecategoriseerd
TaalNederlands
Grootte8034 MB