- 42 -
Error code Descripon Soluons
F35 No AC grid
No Utility
1. Please confirm grid is lost or not;
2. Check the grid connection is good or not;
3. Check the switch between inverter and grid is on or not;
4. Seek help from us, if can not go back to normal state.
F41 Parallel system stop
1. Check the hybrid inverter working status. If there's 1 pcs
hybrid inverter is in OFF status, the other hybrid inverters
may report F41 fault in parallel system.
2. If the fault still exists, please contact us for help.
F42 AC line low voltage
F47 AC over frequency
Grid voltage fault
1. Check the AC voltage is in the range of standard voltage in
specification;
2. Check whether grid AC cables are firmly and correctly
connected;
3. Seek help from us, if can not go back to normal state.
Grid frequency out of range
1. Check the frequency is in the range of specification or not;
2. Check whether AC cables are firmly and correctly connected;
3. Seek help from us, if can not go back to normal state.
F48 AC lower frequency
Grid frequency out of range
1. Check the frequency is in the range of specification or not;
2. Check whether AC cables are firmly and correctly connected;
3. Seek help from us, if can not go back to normal state.
F56
DC busbar voltage is
too low
Battery voltage low
1. Check whether battery voltage is too low;
2. If the battery voltage is too low, using PV or grid to charge the
battery;
3. Seek help from us, if can not go back to normal state.
F34 AC Overcurrent fault
1. Check the backup load connected, make sure it is in allowed
power range;
2. If the fault still exists, please contact us for help.
F24
DC insulation impedance
failure
F26
The DC busbar is
unbalanced
F29 Parallel CANBus fault
PV isolation resistance is too low
1. Check the connection of PV panels and inverter is firmly and
correctly;
2. Check whether the PE cable of inverter is connected to ground;
3. Seek help from us, if can not go back to normal state.
1. Please wait for a while and check whether it is normal;
2. When the hybrid in split phase mode, and the load of L1 and
load of L2 is big different, it will report the F26.
3. Restart the system 2~3 times.
4. Seek help from us, if can not go back to normal state.
1. When in parallel mode, check the parallel communication cable
connection and hybrid inverter communication address setting;
2. During the parallel system startup period, inverters will report F29.
when all inverters are in ON status, it will disappear automatically;
3. If the fault still exists, please contact us for help.
Bekijk gratis de handleiding van Deye SUN-12K-SG02LP1-AU-AM3, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Deye |
Model | SUN-12K-SG02LP1-AU-AM3 |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 7849 MB |