Deye BOS-G Pro handleiding

59 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 9 van 59
6
Minimum Product installation distance
The minimum distance to the surrounding building when the battery is installed is
100mm, and the minimum distance between the two Products is 100mm.
1.7 Quality Certificate
The quality certificate can be downloaded from www.deyeess.com.
1.8 Requirements for Installation Personnel
All work shall comply with local applicable regulations and standards.
The installation of BOS-G Pro can only be completed by electricians with the following
qualifications:
Trained in dealing with hazards and risks associated with the installation and operation of
electrical equipment, systems, and batteries.
Trained on installation and debugging of electrical equipment.

Bekijk gratis de handleiding van Deye BOS-G Pro, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkDeye
ModelBOS-G Pro
CategorieNiet gecategoriseerd
TaalNederlands
Grootte13342 MB