Handleiding
Je bekijkt pagina 49 van 149

Figure 9. Battery cable routing
Figure 10. Installing the battery
Steps
1. Using the alignment posts, place the battery on the palm-rest assembly.
2. Align the screw holes on the battery with the screw holes on the palm-rest assembly.
3. Tighten the four captive screws that secure the battery to the palm-rest assembly.
4. Connect the battery cable to the battery cable connector (BATT1) on the system board.
Removing and installing Customer Replaceable Units (CRUs)
49
Bekijk gratis de handleiding van Dell Pro 13 Plus, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Dell |
| Model | Pro 13 Plus |
| Categorie | Laptop |
| Taal | Nederlands |
| Grootte | 55186 MB |







