7 | Installation
Installer reference guide
64
RZAG71~140N
Sky Air Alpha-series
4P695307-1A – 2024.02
g
b
a
f
e
cd
a Gas pipe
b Gas pipe insulation
c Interconnection cable
d Field wiring (if applicable)
e Liquid pipe
f Liquid pipe insulation
g Finishing tape
2 Install the service cover.
7.8.2 To close the outdoor unit
2
1
4
3
PH2
8 mm
7.8.3 To check the insulation resistance of the compressor
NOTICE
If, after installation, refrigerant accumulates in the compressor, the insulation
resistance over the poles can drop, but if it is at least 1MΩ, then the unit will not
break down.
Use a 500V mega-tester when measuring insulation.
Do NOT use a mega-tester for low voltage circuits.
1 Measure the insulation resistance over the poles.
If Then
≥1MΩ Insulation resistance is OK. This procedure is
finished.
<1MΩ Insulation resistance is not OK. Go to the next step.
2 Turn ON the power and leave it on for 6hours.
Result: The compressor will heat up and evaporate any refrigerant in the
compressor.
3 Measure the insulation resistance again.

Bekijk gratis de handleiding van Daikin RZAG125N2V1B, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkDaikin
ModelRZAG125N2V1B
CategorieNiet gecategoriseerd
TaalNederlands
Grootte11803 MB