13 Unit installation
Installation and operation manual
15
RYYQ+RYMQ+RXYQ
VRV IV+ heat pump
4P546220-1F – 2023.01
DANGER: RISK OF BURNING/SCALDING
14×14×
8~12 HP 14~20 HP
Once the front plates open, the electrical component box can be
accessed. See "13.2.2To open the electrical component box of the
outdoor unit"[415].
For service purposes, the pushbuttons on the main PCB need to be
accessed. To access these pushbuttons, the electrical component
box cover does not need to be opened. See "16.1.3To access the
field setting components"[433].
13.2.2 To open the electrical component box of
the outdoor unit
NOTICE
Do NOT apply excessive force when opening the
electronic component box cover. Excessive force can
deform the cover, resulting in entering of water to cause
equipment failure.
8~12 HP
SW8
14~20 HP
SW8
NOTICE
When closing the electrical component box cover, make
sure that the sealing material on the lower back side of the
cover is NOT caught and bent towards the inside (see
figure below).
a
b
c
d
e
a Electrical component box cover
b Front side
c Power supply terminal block
d Sealing material
e Moisture and dirt could enter
NOT allowed
Allowed
13.3 Mounting the outdoor unit
13.3.1 To provide the installation structure
Make sure the unit is installed level on a sufficiently strong base to
prevent vibration and noise.
NOTICE
When the installation height of the unit needs to be
increased, do NOT use stands to only support the
corners.
Stands under the unit must be at least 100mm wide.
≥100 mm
≥100 mm
*
NOT allowed
Allowed (* = preferred installation)
The height of the foundation must at least be 150 mm from the
floor. In heavy snowfall areas, this height should be increased,
depending on the installation place and condition.
The preferred installation is on a solid longitudinal foundation
(steel beam frame or concrete). The foundation must be larger
than the grey marked area.
729
≤613
≥929
AB
AA
a
(mm)
Minimum foundation
a Anchor point (4×)
HP AA AB
8~12 766 992
14~20 1076 1302
Fasten the unit in place using four foundation bolts M12. It is best
to screw in the foundation bolts until their length remains 20mm
above the foundation surface.
20 mm

Bekijk gratis de handleiding van Daikin RYYQ10U7Y1B, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkDaikin
ModelRYYQ10U7Y1B
CategorieNiet gecategoriseerd
TaalNederlands
Grootte8429 MB