Handleiding
Je bekijkt pagina 18 van 72

6 Installation
Installer and user reference guide
18
RXYTQ8~16T7YF
VRV IV system air conditioner
4P388989-1A – 2015.07
▪ Routing and connecting the refrigerant piping to the outdoor unit
▪ Protecting the outdoor unit against contamination
▪ Connecting the refrigerant piping to the indoor units (see the
installation manual of the indoor units)
▪ Connecting the multi-connection piping kit
▪ Connecting the refrigerant branching kit
▪ Keeping in mind the guidelines for:
▪ Brazing
▪ Using the stop valves
▪ Removing the pinched pipes
6.4.3 To route the refrigerant piping
Installation of refrigerant piping is possible as front connection or
side connection (when taken out from the bottom) as shown in the
figure below.
a b
c
a Left-side connection
b Front connection
c Right-side connection
For side connections, the knockout hole on the bottom plate should
be removed:
c
b
a
a Large knockout hole
b Drill
c Points for drilling
NOTICE
Precautions when making knockout holes:
▪ Avoid damaging the casing.
▪ After making the knockout holes, we recommend you
remove the burrs and paint the edges and areas
around the edges using repair paint to prevent rusting.
▪ When passing electrical wiring through the knockout
holes, wrap the wiring with protective tape to prevent
damage.
6.4.4 To connect the refrigerant piping to the
outdoor unit
INFORMATION
All local inter unit piping are field supplied except the
accessory pipes.
NOTICE
Precautions when connecting field piping. Add brazing
material as shown in the figure.
1
1
1
1
2 2
≤Ø25.4 >Ø25.4
NOTICE
▪ Be sure to use the supplied accessory pipes when
carrying out piping work in the field.
▪ Be sure that the field installed piping does not touch
other pipes, the bottom panel or side panel. Especially
for the bottom and side connection, be sure to protect
the piping with suitable insulation, to prevent it from
coming into contact with the casing.
Connection from the stop valves to the field piping can be done by
using accessory pipes supplied as accessory.
The connections to the branch kits are the responsibility of the
installer (field piping).
6.4.5 To connect the multi connection piping kit
NOTICE
Improper installation may lead to malfunction of the
outdoor unit.
▪ Install the joints horizontally, so that the caution label (a) attached
to the joint comes to the top.
▪ Do not tilt the joint more than 7.5° (see view A).
▪ Do not install the joint vertically (see view B).
a
a
A B
7.5°
7.5°
a Caution label
X Not allowed
O Allowed
▪ Make sure that the total length of the piping connected to the joint
is absolute straight for more than 500mm. Only if a straight field
piping of more than 120mm is connected, more than 500mm of
straight section can be ensured.
>120 mm
>500 mm
Bekijk gratis de handleiding van Daikin RXYTQ28TYF, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Daikin |
Model | RXYTQ28TYF |
Categorie | Airco |
Taal | Nederlands |
Grootte | 11898 MB |