14 Piping installation
Installation and operation manual
28
RXYQQ8~20U7Y1B
VRV IV Q+ series heat pump
4P546221-1B – 2020.10
Pre-charging refrigerant
"t23" is flashing
Push BS2 within 5 minutes
Open valve A
("t22" startup control)
("t23" waiting for stable heating)
"t03" is flashing
Push BS2 within 5 minutes
Open valve A
("t02" startup control)
("t03" waiting for stable cooling)
Display shows "t23" and low pressure value with an interval of 1 second.
Add additional refrigerant amount P (kg)
Close valve A
Push BS3 to stop operation
Ending code "t26" will appear
Display shows "t03" and low pressure value with an interval of 1 second.
Refrigerant will be charged automatically.
"pe"=charging nearly finished
"p9"=charging finished
OR
P (kg) was added during autocharge.
R=Q+P
Push BS2
T
A
check will be performed
Close valve A
Push BS1 to leave program
Charging is finished
Fill in the amount on the additional refrigerant charge label
Go to test run
If following codes appear:
"e-2" (indoor temperature out of range) and
"e-3" (outdoor temperature out of range)
In this case, perform automatic charging procedure again.
"t0X" will appear
Push BS1
Charging is finished
Fill in the amount on the
additional refrigerant charge
label
Go to test run
Following codes appear:
"e-2" (indoor temperature out of
range) and
"e-3" (outdoor temperature out of
range)
Push BS1 to leave program
Charging is finished
Fill in the amount on the
additional refrigerant charge
label
Go to test run
During grey conditions
<< Continuation of previous page
Heating charging Cooling charging
14.4.5 To charge refrigerant
Follow the steps as described below and take into account whether
you want to use the automatic charge function or not.
Pre-charging refrigerant
1 Calculate the additional amount of refrigerant to be added using
the formula mentioned in To determine the additional refrigerant
amount.
2 The first 10 kg of additional refrigerant can be pre-charged
without outdoor unit operation.
If Then
The additional refrigerant amount
is smaller than 10kg
Perform steps 3~4.
The additional refrigerant charge
is larger than 10 kg
Perform steps 3~6.
3 Pre-charging can be done without compressor operation, by
connecting the refrigerant bottle to the service port of the liquid
stop valve (open valve B). Make sure that the stop valves are
closed (valve A and C, liquid and gas line).
B
C
A
a
b c e
f
g
h
i
j j j
k
l
m
n
o
d
a Pressure reducing valve
b Nitrogen
c Weighing scales
d Refrigerant R410A tank (siphon system)
e Vacuum pump
f Charge hose
g Refrigerant charge port
h Gas line stop valve

Bekijk gratis de handleiding van Daikin RXYQQ16U7Y1B, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkDaikin
ModelRXYQQ16U7Y1B
CategorieNiet gecategoriseerd
TaalNederlands
Grootte8215 MB