Daikin RXM50A5V1B handleiding
Handleiding
Je bekijkt pagina 56 van 80

12 | Commissioning
Installer reference guide
56
RXA-B8, RXM-A(9), ARXM-A(9), RXP-N9, RXF-D(9), ARXF-A(9), RZAG-B
R32 split series
4P766272-2 – 2024.01
12 Commissioning
NOTICE
General commissioning checklist. Next to the commissioning instructions in this
chapter, a general commissioning checklist is also available on the Daikin Business
Portal (authentication required).
The general commissioning checklist is complementary to the instructions in this
chapter and can be used as a guideline and reporting template during commissioning
and hand-over to the user.
In this chapter
12.1 Precautions when commissioning.......................................................................................................................................... 56
12.2 Checklist before commissioning............................................................................................................................................. 57
12.3 Checklist during commissioning............................................................................................................................................. 57
12.4 To perform a test run ............................................................................................................................................................. 57
12.5 Starting up the outdoor unit .................................................................................................................................................. 58
12.1 Precautions when commissioning
DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING/SCALDING
CAUTION
Do NOT perform the test operation while working on the indoor units.
When performing the test operation, NOT ONLY the outdoor unit, but the connected
indoor unit will operate as well. Working on an indoor unit while performing a test
operation is dangerous.
CAUTION
Do NOT insert fingers, rods or other objects into the air inlet or outlet. Do NOT
remove the fan guard. When the fan is rotating at high speed, it will cause injury.
NOTICE
Turn ON the power 6 hours before operation in order to have power running to the
crankcase heater and to protect the compressor.
NOTICE
ALWAYS operate the unit with thermistors and/or pressure sensors/switches. If NOT,
burning of the compressor might be the result.
During test operation, the outdoor unit and the indoor units will start up. Make
sure that the preparations of all indoor units are finished (field piping, electrical
wiring, air purge, ...). See installation manual of the indoor units for details.
Bekijk gratis de handleiding van Daikin RXM50A5V1B, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Daikin |
| Model | RXM50A5V1B |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 10482 MB |







