19 Commissioning
Installation and operation manual
44
REMA5+REYA8~20A7Y1B
VRV 5 heat recovery
4P684060-1C – 2024.10
Each time when the automatic leak detection function was executed
the system will stay idle until it is restarted by manual thermo ON
request or by next scheduled action.
[2‑88] Description
0 (default) No leak detection planned.
1 Leak detection planned once in [2‑65] days.
2 Leak detection planned every [2‑65] days.
18.2 Using the leak detection function
18.2.1 About automatic leak detection
The (automatic) leak detection function is not by default activated
and can only start working when the additional refrigerant charge
was input into the system's logic (see [2‑14]).
The leak detection operation can be automated. By changing
parameter [2‑88] to chosen value, the interval time or the time until
the next automatic leak detection operation can be chosen. The
parameter [2‑88] defines whether the leak detection operation is
executed one time (within [2‑65] days) or intermittent, respecting an
interval of [2‑65] days.
Availability of the leak detection function feature requires input of the
additional refrigerant charge amount immediately after finishing the
charging. The input must be executed before performing the test
operation.
NOTICE
If a wrong value is input for the additional charged
refrigerant weight, the accuracy of the leak detection
function will decrease.
INFORMATION
The weighed and already recorded amount of
additional refrigerant charge (not the total amount of
refrigerant present in the system) must be entered.
When the height difference between indoor units is
≥50/40m, the leak detection function can not be used.
19 Commissioning
CAUTION
See "2 Specific installer safety instructions" [4 4] to make
sure commissioning complies with all safety regulations.
NOTICE
General commissioning checklist. Next to the
commissioning instructions in this chapter, a general
commissioning checklist is also available on the Daikin
Business Portal (authentication required).
The general commissioning checklist is complementary to
the instructions in this chapter and can be used as a
guideline and reporting template during commissioning and
hand-over to the user.
19.1 Precautions when commissioning
CAUTION
Do NOT perform the test operation while working on
the indoor unit(s).
When performing the test operation, NOT ONLY the
outdoor unit, but the connected indoor unit will operate as
well. Working on an indoor unit while performing a test
operation is dangerous.
NOTICE
Turn ON the power 6 hours before operation in order to
have power running to the crankcase heater and to protect
the compressor.
NOTICE
Test run is possible for ambient temperatures between
–⁠10°C and 46°C.
During test operation, the outdoor unit and the indoor units will start
up. Make sure that the preparations of all indoor units are finished
(field piping, electrical wiring, air purge, ...). See installation manual
of the indoor units for details.
19.2 Checklist before commissioning
1 After the installation of the unit, check the items listed below.
2 Close the unit.
3 Power up the unit.
You have read the complete installation and operation
instructions described in the installer and user reference
guide.
Installation
Check that the unit is properly installed, to avoid abnormal
noises and vibrations when starting up the unit.
Transportation stay
Check that the outdoor unit's transportation stay is
removed.
Field wiring
Check that the field wiring has been carried out according
to the instructions described in the chapter "17Electrical
installation" [4 36], according to the wiring diagrams and
according to the applicable national wiring regulation.
Power supply voltage
Check the power supply voltage on the local supply panel.
The voltage MUST correspond to the voltage on the
nameplate of the unit.
Earth wiring
Be sure that the earth wires have been connected
properly and that the earth terminals are tightened.
Insulation test of the main power circuit
Using a megatester for 500 V, check that the insulation
resistance of 2 or more is attained by applying a
voltage of 500VDC between power terminals and earth.
NEVER use the megatester for the interconnection wiring.
Fuses, circuit breakers, or protection devices
Check that the fuses, circuit breakers, or the locally
installed protection devices are of the size and type
specified in the chapter "17.2 Specifications of standard
wiring components"[437]. Be sure that neither a fuse nor
a protection device has been bypassed.
Internal wiring
Visually check the switch box and the inside of the unit for
loose connections or damaged electrical components.
Pipe size and pipe insulation
Be sure that correct pipe sizes are installed and that the
insulation work is properly executed.
Stop valves
Be sure that the stop valves are open on both liquid and
gas side.
Damaged equipment
Check the inside of the unit for damaged components or
squeezed pipes.

Bekijk gratis de handleiding van Daikin REYA16A7Y1B, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkDaikin
ModelREYA16A7Y1B
CategorieNiet gecategoriseerd
TaalNederlands
Grootte10147 MB