Daikin REYA12A7Y1B handleiding
Handleiding
Je bekijkt pagina 24 van 60

14 Unit installation
Installation and operation manual
24
REMA5+REYA8~20A7Y1B
VRV 5 heat recovery
4P684060-1C – 2024.10
14.1.2 Additional installation site requirements
of the outdoor unit in cold climates
NOTICE
When operating the unit in a low outdoor ambient
temperature with high humidity conditions, make sure to
take precautions to keep the drain holes of the unit free by
using proper equipment.
In heating:
T
AO
(°C WB)
a b
20
15.5
15
10
5
0
–5
–10
–15
–20
10 15 20 25
27
30
T
AI
(°C DB)
a Warming up operation range
b Operation range
T
AI
Ambient indoor temperature
T
AO
Ambient outdoor temperature
If the unit has to operate for 5 days in this area with
high humidity (>90%), Daikin recommends to install the
optional heater tape kit (EKBPH012TA or EKBPH020TA)
to keep the drain holes free.
14.2 Opening the unit
14.2.1 To open the outdoor unit
DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING/SCALDING
14×14×
5~12 HP 14~20 HP
Once the front plates open, the switch box can be accessed. See
"14.2.2To open the switch box of the outdoor unit"[424].
For service purposes, the pushbuttons on the main PCB need to be
accessed. To access these pushbuttons, the switch box cover does
not need to be opened. See "18.1.3 To access the field setting
components"[441].
14.2.2 To open the switch box of the outdoor
unit
NOTICE
Do NOT apply excessive force when opening the switch
box cover. Excessive force can deform the cover, resulting
in entering of water to cause equipment failure.
5~12 HP
2×
SW8
14~20 HP
6×
SW8
NOTICE
When closing the switch box cover, make sure that the
sealing material on the lower back side of the cover is NOT
caught and bent towards the inside (see figure below).
a
b
c
d
e
a Switch box cover
b Front side
c Power supply terminal block
d Sealing material
e Moisture and dirt could enter
NOT allowed
Allowed
14.3 Mounting the outdoor unit
14.3.1 To provide the installation structure
Make sure the unit is installed level on a sufficiently strong base to
prevent vibration and noise.
NOTICE
▪ When the installation height of the unit needs to be
increased, do NOT use stands to only support the
corners.
▪ Stands under the unit must be at least 100mm wide.
NOTICE
The height of the foundation must at least be 150mm from
the floor. In heavy snowfall areas, this height should be
increased up to the average expected snow level,
depending on the installation place and condition.
Bekijk gratis de handleiding van Daikin REYA12A7Y1B, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Daikin |
Model | REYA12A7Y1B |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 10147 MB |