15 Commissioning
Installation and operation manual
20
FXZA15~50A2VEB
VRV system air conditioner
3P599603-1E – 2024.02
14.2 To connect the electrical wiring to
the indoor unit
NOTICE
Follow the wiring diagram (delivered with the unit,
located at the inside of the service cover).
For instructions on how to connect the optional
equipment, see the installation manual delivered with
the optional equipment.
Make sure the electrical wiring does NOT obstruct
proper reattachment of the service cover.
It is important to keep the power supply and the interconnection
wiring separated from each other. In order to avoid any electrical
interference the distance between both wirings should ALWAYS be
at least 50mm.
NOTICE
Be sure to keep the power line and interconnection line
apart from each other. Interconnection wiring and power
supply wiring may cross, but may NOT run parallel.
1 Remove the service cover.
2 User interface cable: Route the cable through the frame,
connect the cable to the terminal block (symbols P1, P2).
3 Interconnection cable: Route the cable through the frame,
connect the cable to the terminal block (make sure the symbols
F1, F2 match with the symbols on the outdoor unit). Bundle the
interconnection cable with the user interface cable and fix them
with a tie wrap on the wiring fixture.
4 Power supply cable: Route the cable through the frame and
connect the cable to the terminal block (L, N, earth). Fix the
cable with a tie wrap on the wiring fixture.
a
b
a Circuit breaker
b Residual current device
5 Divide the small sealing (accessory) and wrap it around the
cables to prevent water from entering the unit.
6 Seal all gaps with a sealing material (field supply) to prevent
small animals from entering the system.
7 Reattach the service cover.
L
N
a
b
b
10~15
70~90
10~20
10~15
70~90
7
d
d
e
c
P1P2 F1 F2
a Service cover (with wiring diagram)
b Opening for cables
c Connection of power supply
d Tie wrap (accessory)
e Connection of user interface and interconnection cable
Complete system example
1 user interface controls 1 indoor unit.
LN LN LN
P
1
P
2
P
1
P
2
P
1
P
2
P
1
P
2
P
1
P
2
F
1
F
2
T
1
T
2
P
1
P
2
F
1
F
2
T
1
T
2
P
1
P
2
F
1
F
2
T
1
T
2
P
1
P
2
F
1
F
2
T
1
T
2
N L
d
c
b
LN
N L N L N L
TO OUT/D
TO IN/D
a
a Outdoor unit
b Indoor unit
c User interface
d Most downstream indoor unit
NOTICE
For the use of group control and related limitations refer to
manual of outdoor unit.
CAUTION
Each indoor unit has to be connected to a separate
user interface. Only a safety system compatible remote
controller can be used as the user interface. See
technical data sheet for remote controller compatibility
(e.g. BRC1H52/82*).
The user interface has to be put in the same room as
the indoor unit. For details, please refer to the
installation and operation manual of the user interface.
CAUTION
In case shielded wire is used, connect the shielding to the
outdoor unit side only.
15 Commissioning
NOTICE
General commissioning checklist. Next to the
commissioning instructions in this chapter, a general
commissioning checklist is also available on the Daikin
Business Portal (authentication required).
The general commissioning checklist is complementary to
the instructions in this chapter and can be used as a
guideline and reporting template during commissioning and
hand-over to the user.
NOTICE
ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.
15.1 Checklist before commissioning
1 After the installation of the unit, check the items listed below.
2 Close the unit.
3 Power up the unit.

Bekijk gratis de handleiding van Daikin FXZA20A2VEB, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkDaikin
ModelFXZA20A2VEB
CategorieAirco
TaalNederlands
Grootte4302 MB