5
FXLQ20~63P7VEB + FXNQ20~63P7VEB
VRV System air conditioners
4PW59127-1A
■ For FXNQ units only
R
EFRIGERANT
PIPING
WORK
For refrigerant piping of outdoor unit, refer to the installation manual
supplied with the outdoor unit.
Before rigging tubes, check which type of refrigerant is used.
■ Use a pipe cutter and flare suitable for the used refrigerant.
■ To prevent dust, moisture or other foreign matter from infiltrating
the tube, either pinch the end, or cover it with tape.
■ Use copper alloy seamless pipes (ISO 1337).
■ The outdoor unit is charged with refrigerant.
■ To prevent water leakage, execute heat insulation work
completely on both sides of the gas and liquid piping. When
using a heat pump, the temperature of the gas piping can reach
up to approximately 120°C. Use insulation which is sufficiently
heat resistant.
■ Be sure to use both a spanner and torque wrench together when
connecting or disconnecting pipes to/from the unit.
■ Do not mix anything other than the specified refrigerant, such as
air, etc..., inside the refrigerant circuit.
■ Flares should not be re-used. New ones should be made in
order to prevent leaks.
Only use annealed flare nuts included with the unit. Using
different flare nuts may cause the refrigerant to leak.
■ Refer to the table below for the dimensions of flare nut spaces
and the appropriate tightening torque. (Overtightening may
damage the flare and cause leaks.)
■ When connecting the flare nut, coat the flare inner surface with
ether oil or ester oil and initially tighten 3 or 4 turns by hand
before tightening firmly.
■ Finally, insulate as shown in the figure below.
X Heigth to reduce
NOTE
When mounting the unit to a wall, operating sound may
become bigger.
All field piping must be provided by a licensed refrigeration
technician and must comply with the relevant local and
national codes.
Place Installation period Protection method
More than a month Pinch the pipe
Less than a month
Pinch or tape the pipe
Regardless of the period
13
9
10
8
9
8
10
13
12
12
11
1
1
2
4
3
X
X
Pipe gauge
(mm)
Tightening
torque (N•m)
Flare dimension
A (mm)
Flare shape
Ø6.4 15~17 8.7~9.1
Ø9.5 33~39 12.8~13.2
Ø12.7 50~60 16.2~16.6
Ø15.9 63~75 19.3~19.7
■ Be sure to insulate local piping all the way into the
pipe connections inside the unit.
Exposed piping may cause condensation or may
cause burns when touched.
■ After all piping has been connected, use nitrogen to
perform a gas leak check. A toxic gas may be
released by the refrigerant gas leaking indoor and
being exposed to flames from an area heater, cooking
stove, etc. If the refrigerant gas leaks during the work,
ventilate the area.
1 Insulation for gas pipe (accessory part)
2 Sealing pad (accessory part) (wrapped over union)
3 Clamp (4x accessory part)
4 Gas pipe
5 Insulation for liquid pipe (accessory part)
6 Liquid pipe
12
4
3
1 Torque wrench
2 Spanner
3 Piping union
4 Flare nut
R=0.4~0.8
45°
±2
90°
±2
A
1
2
3
4
6
5
01_EN_TR.fm Page 8 Thursday, November 11, 2010 5:52 PM
Bekijk gratis de handleiding van Daikin FXLQ32P5VEB, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Daikin |
Model | FXLQ32P5VEB |
Categorie | Airco |
Taal | Nederlands |
Grootte | 2502 MB |