15 Finishing the indoor unit installation
Installation and operation manual
22
FXAA15~63AUV1B
VRV system air conditioner
3P622285-1C – 2022.02
NOTICE
For the use of group control and related limitations refer to
manual of outdoor unit.
CAUTION
Each indoor unit has to be connected to a separate
user interface. Only a safety system compatible remote
controller can be used as the user interface. See
technical data sheet for remote controller compatibility
(e.g. BRC1H52/82*).
The user interface has to be put in the same room as
the indoor unit. For details, please refer to the
installation and operation manual of the user interface.
CAUTION
In case shielded wire is used, connect the shielding to the
outdoor unit side only.
15 Finishing the indoor unit
installation
15.1 To fix the unit on the mounting
plate
1 Remove the piece of packing material.
2 Press the bottom frame of the unit with both hands to set it on
the bottom hooks of the mounting plate. Make sure that the
wires do NOT get squeezed or caught anywhere.
3 Press the bottom edge of the indoor unit with both hands until it
is firmly caught by the mounting plate hooks.
4 Secure the indoor unit to the mounting plate using 2 indoor unit
fixing screws M4×12L (accessory).
a
b
e
c
d
a Mounting plate (accessory)
b Refrigerant piping
c Insulation tape
d Bottom frame
e Screw M4×12L (2 pieces from accessory)
5 Re-install the front grille ("12.2.4 To re-install the front
grille"[415]).
6 Re-install the front panel ("12.2.2 To re-install the front
panel"[415]).
16 Commissioning
NOTICE
General commissioning checklist. Next to the
commissioning instructions in this chapter, a general
commissioning checklist is also available on the Daikin
Business Portal (authentication required).
The general commissioning checklist is complementary to
the instructions in this chapter and can be used as a
guideline and reporting template during commissioning and
hand-over to the user.
NOTICE
ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.
16.1 Checklist before commissioning
1 After the installation of the unit, check the items listed below.
2 Close the unit.
3 Power up the unit.
You have read the complete installation and operation
instructions described in the installer and user reference
guide.
Installation
Check that the unit is properly installed, to avoid abnormal
noises and vibrations when starting up the unit.
Drainage
Make sure drainage flows smoothly.
Possible consequence: Condensate water might drip.
Field wiring
Be sure that the field wiring has been carried out
according to the instructions described in the chapter
"14 Electrical installation" [4 20], according to the wiring
diagrams and according to the applicable legislation.
Power supply voltage
Check the power supply voltage on the local supply panel.
The voltage MUST correspond to the voltage on the
nameplate of the unit.
Earth wiring
Be sure that the earth wires have been connected
properly and that the earth terminals are tightened.
Fuses, circuit breakers, or protection devices
Check that the fuses, circuit breakers, or the locally
installed protection devices are of the size and type
specified in the chapter "14 Electrical installation" [4 20].
Be sure that neither a fuse nor a protection device has
been bypassed.
Internal wiring
Visually check the electrical component box and the
inside of the unit for loose connections or damaged
electrical components.
Pipe size and pipe insulation
Be sure that correct pipe sizes are installed and that the
insulation work is properly executed.
Damaged equipment
Check the inside of the unit for damaged components or
squeezed pipes.
Field settings
Make sure all field settings you want are set. See
"17.1Field setting"[423].

Bekijk gratis de handleiding van Daikin FXAA25AUV1B, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkDaikin
ModelFXAA25AUV1B
CategorieNiet gecategoriseerd
TaalNederlands
Grootte4375 MB