EWAQ016~064BAW + EWYQ016~064BAW
Packaged air-cooled water chiller
4PW70082-1E 2016.12
Installation and operation manual
8
8.3. Dimensions of the unit
For dimensions of the unit, refer to the technical specifications table
in "5.1. About the small inverter chiller" on page 3. The following
figure shows the dimensions mentioned in the table (it is important to
keep in mind the pitch of the foundation bolt holes).
1 EWA/YQ016-025
2 EWA/YQ032
3 EWA/YQ040-050
4 EWA/YQ064
5 Pitch of foundation bolt holes (15x22.5 oblong holes)
8.4. Installation space
The space around the unit is adequate for servicing and the minimum
space for air inlet and air outlet is available. (Refer to the figure below
and choose one of the possibilities). Refer to figure 2.
Table 1 Distance from wall (or other unit) in regions without heavy
snowfall
Table 2 Distance from wall (or other unit) in regions with heavy
snowfall
Suction side
If the location of the installation is in a region with heavy snowfall,
then dimensions a and b should be >500 mm to avoid accumulation
of ice in between the units.
8.5. Application example
a Outdoor unit
b Plate heat exchanger
c Expansion vessel
d Pump
e Shut-off valve
f Motorized valve
g Bypass valve
FCU1...3 Fan coil unit (field supply)
RC Remote controller
RT1...3 Room thermostat
8.6. Inspecting, handling and unpacking the unit
8.6.1. Inspection
At delivery, the unit must be checked and any damage must be
reported immediately to the carrier’s claims agent.
8.6.2. Handling
When handling the unit, take into account the following:
2 Choose on beforehand the path along which the unit is to be
brought in.
3 Bring the unit as close as possible to its final installation position
in its original package to prevent damage during transport.
Refer to figure 4.
1 Packaging material
2 Belt sling
3 Protector
4 Opening
5 Forklift
4 Lift the unit preferably with a crane and 2 belts of at least 8 m
long as shown in the figure above.
Always use protectors to prevent belt damage and pay attention
to the position of the unit's centre of gravity.
A forklift can only be used for transport as long as the unit
remains on its pallet as shown in figure 4.
8.6.3. Unpacking
Remove the packing material from the unit:
- Take care not to damage the unit when removing the shrink
foil with a cutter.
- Remove the top palette(s) and cardboard plate(s) before
removing the upright cardboard protection pieces.
Refer to figure 3.
Remove the screws fixing the unit to its pallet.
8.7. Placing the unit
1 Lift the unit onto its proper foundation. Refer to figure 5.
1 Belt sling
2 Protector
3 Opening
2 Lift the unit preferably with a crane and 2 belts of at least 8 m
long as shown in the figure above.
Always use protectors to prevent belt damage and pay attention
to the position of the unit's centre of gravity.
5
12
34
H
W
D
H
W
D
H
W
D
H
W
D
RC
RT1
M1
RT2
M2
RT3
M3
FC1 FC2 FC3
a b c e
e f
i
f f
g
d
1 Fragile, handle the unit with care
Keep the unit upright in order to avoid compressor
damage.
CAUTION
Use a belt sling that adequately bears the weight of
the unit.
CAUTION
To avoid injury, do not touch the air inlet or aluminium fins
of the unit.
WARNING
Tear apart and throw away plastic packaging bags so
that children will not play with them. Children playing
with plastic bags face danger of death by suffocation.
CAUTION
Use a belt sling that adequately bears the weight of
the unit.
4PWEN70082-1E_2016_12.book Page 8 Wednesday, December 7, 2016 2:18 PM

Bekijk gratis de handleiding van Daikin EWYQ-BAWN, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkDaikin
ModelEWYQ-BAWN
CategorieAirco
TaalNederlands
Grootte9272 MB