Daikin EWAT016CZP handleiding

52 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 16 van 52
D-EIMHP01405-21_11EN 16/52
Figure 5 Mounting holes location (bottom view)
Before unit commissioning, the flatness must be verified by using a laser levelling device or similar devices. The flatness
shall not be over 5 mm for units within 7 m length.
To ensure best performance on the installation site, the following precautions and instructions must be followed
Avoid air flow recirculation;
Make sure that there are no obstacles to hamper air flow;
Make sure to provide a strong and solid foundation to reduce noise and vibrations;
Avoid installation in particularly dusty environments, to reduce soiling of condensers coils.
4.3.1 Mounting the main switch handle
1. Unpair the locknut from the handle of the main switch
2. Place the handle in the hole dedicated
3. Fix the main switch handle by tightening the locknut from the back of the panel
4. Insert the rod of the main switch
5. Fasten the rod of the main switch
6. Mount the panel
4.4 Minimum space requirements
It is fundamental to respect minimum distances on all units to ensure optimum ventilation to the condenser coils.
When deciding where to position the unit and to ensure a proper air flow, the following factors must be taken into
consideration:
avoid any warm air recirculation.
avoid insufficient air supply to the air-cooled condenser.
Locknut
Rod
External panel

Bekijk gratis de handleiding van Daikin EWAT016CZP, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkDaikin
ModelEWAT016CZP
CategorieAirco
TaalNederlands
Grootte9712 MB