Daikin ETBH16DF6V handleiding

264 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 68 van 264
6 | Unit installation
Installer reference guide
68
EPRA14~18DAV3+W1 + ETBH/X16DA6V+9W
Daikin Altherma 3 H HT W
4P587501-1A – 2020.01
6.3.3 To provide the installation structure
Check the strength and level of the installation ground so that the unit will not
cause any operating vibration or noise.
Fix the unit securely by means of foundation bolts in accordance with the
foundation drawing.
NOTICE
Level. Make sure the unit is level. Recommended:
Use 4 sets of M12 anchor bolts, nuts and washers. Provide at least 150mm of free
space below the unit. Additionally, make sure the unit is positioned at least
100mm above the maximum expected level of snow.
Anchor points
800
(mm)
479
Pedestal
When installing on a pedestal, make sure that the discharge grille still can be put in
its safety position. See "6.3.7To remove the discharge grille, and put the grille in
safety position"[472].
800
479
a
≥150
(mm)
M12

Bekijk gratis de handleiding van Daikin ETBH16DF6V, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkDaikin
ModelETBH16DF6V
CategorieNiet gecategoriseerd
TaalNederlands
Grootte40307 MB