Daikin DSR1 handleiding

52 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 15 van 52
15
User – Parameters
P02 Weekday
Shows the list with the weekdays Monday to Sunday. Before com-
missioning of the controller or after a prolonged power failure, set
the current weekday using this parameter.
P03 Day's production
Shows the day's production in Wh or kWh. Is automatically reset to
00:00 every day at 0000. The day's production can be reset manu-
ally by pressing the OK button (query: Are you sure? Yes No). The
day's production is automatically added to the total production at
the end of the day.
P04 Total production
Shows the total production in Wh or kWh. Is automatically increment-
ed by the day's production every day at 00:00 h. The total production
can be reset manually be holding the OK button pressed for ≥ 2 s.
P05 Pump Kick ON Time/
P06 Pump Kick OFF Time
It is possible that the collector sensor does not measure the real
collector temperature (e.g. if it is partly in the shade). Briefly switch-
ing on the collector pump (pump kick) transports the heat transfer
medium in the collector past the collector sensor in order to measure
the rear collector temperature.
The pump kick function can be switched ON and OFF with the
parameters 05 and 06 during the period in which solar production
is expected.
P05 = OFF: The function is deactivated.
P05 = 00:00 to 23:45: Starting time of the pump kick function.
P06 = 00:15 to 23:45: Stopping time of the pump kick function.
P07 Reheating ON Time/
P08 Reheating OFF Time
If the collector does not generate sufficient heat, additional heat can
be supplied to the storage tank by means of a further heat source.
These parameters allow the function to be activated and the operat-
ing period to be set.
P07 = OFF: The function is deactivated.
P07 = 00:00 to 23:45: Reheating starting time,
P08 = 00:15 to 23:45: Reheating stopping time.
P09 Circulation pump ON time
P10 Circulation pump OFF time
The circulation pump in a water circuit ensures a fast supply of
hot water to the tapping point. In order to avoid heat losses, the
circulation pump should only run during periods when hot water is
expected to be needed.
These parameters allow the function to be activated and the operat-
ing period to be set.
P09 = OFF: The function is deactivated.
P09 = 00:00 to 23:45: Circulation pump starting time.
P10 = 00:15 to 23:45: Circulation pump stopping time.
P11 Antilegion start
Time at which every Saturday the hot water tank and, where a cir-
culation pump is used, also the pipework are heated to the value
defined by parameter 53 (50 to 70 °C) as protection against ther
-
moresistant bacteria.
P11 = 00:00 to 23:45.

Bekijk gratis de handleiding van Daikin DSR1, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkDaikin
ModelDSR1
CategorieNiet gecategoriseerd
TaalNederlands
Grootte4563 MB