18 Installation and Setup of Crestron RF Products Best Practices DOC. 6689H
RF Gateway Installation
After installing and connecting each gateway, check the RF channel and change it if
needed. For more information, refer to the Changing Gateway RF Channelson page 27.
Installation Dos
The physical location of the RF gateway in relation to the connected wireless devices must
be considered for a successful installation. When installing an RF gateway, adhere to the
guidelines below for optimum performance.
Place the gateway in a location as follows:
On the same floor as the wireless devices
NOTE: For Wi-Fi networks, there should be no more than one wall between the
gateway and wireless devices. Both the thickness and material in the obstruction
determine how much signal can pass.
Above the height of most furniture
Away from large metal objects (such as an AV rack, television, or ducting)
NOTE: Plasma TV technology also produces RF interference.
At least 15 feet from all other infiNET EX gateways, Zūm devices, and Wi-Fi access
points
Use the same floor plan to overlay the wireless networks in the house that is shown below.
Floor Plan with infiNET EX Gateway Overlay

Bekijk gratis de handleiding van Crestron ZUMMESH-JBOX-20A-PLUG, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkCrestron
ModelZUMMESH-JBOX-20A-PLUG
CategorieNiet gecategoriseerd
TaalNederlands
Grootte7948 MB