Best Practices DOC. 6689H Installation and Setup of Crestron RF Products 7
Installing RF Devices
When installing RF devices, Crestron recommends that the steps be performed in the order
below:
1. Create a floor plan
2. Create a network list
3. Conduct a site survey
4. Build a channel map
5. Install and configure RF gateways
6. Verify connectivity
7. Perform post-installation checks
Creating a Floor Plan
The first step in a successful RF installation is to create a floor plan of the home or building.
This allows the user to map out where infiNET EX extended range and Wi-Fi gateways are
to be located.
NOTE: Regardless of channel assignments, all gateways and Zūm devices should be
located at least 15 feet from 2.4 GHz Wi-Fi WAPs (Wireless Access Points). This distance
can be relaxed somewhat for WAPs that transmit at lower power levels. The 15-feet
restriction corresponds to an access point that transmits at ~ +28 dBm.
Floor Plan Example

Bekijk gratis de handleiding van Crestron ZUMMESH-JBOX-20A-PLUG, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkCrestron
ModelZUMMESH-JBOX-20A-PLUG
CategorieNiet gecategoriseerd
TaalNederlands
Grootte7948 MB