Cleveland 24CGA10.2ES handleiding
Handleiding
Je bekijkt pagina 18 van 57

1. Installation Checkout
Use the Installation Checklist Table 2-3, to check the overall installation.
Table 2-3. Installation Check List
TASK REFERENCE COMPLETED
Page No.
Preparation
Verify Electric Power Requirements Rating Plate
Verify Gas Supply Requirements 11
Verify Exhaust Hood Requirements 8
Test supply water quality 13
Check operating location clearances 3
Installation
Verify steamer is level 8
Check drain line connection 9
Check Exhaust Hood 8
Check electrical line connection 12
Check water supply connection 16
Test water supply lines 17
Check Gas Supply Connection 11
Leak Test Gas Supply Connection 12
Check Burner Ignition Test 19
Perform Startup and checkout 20
Notes on installation:
Bekijk gratis de handleiding van Cleveland 24CGA10.2ES, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Cleveland |
Model | 24CGA10.2ES |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 14871 MB |