Calorex Delta DT 12 handleiding
Handleiding
Je bekijkt pagina 57 van 84

57
SD675650 ISSUE 6 M172 DELTA
Operations carried out during a planned maintenance visit are as
follows:
1. Replace all belts & filters where fitted.
2. Check operation and condition of all fans and compressors.
3. Check capacitor tolerances.
4. Check condition of all heat exchangers/evaporators.
5. Check refrigeration system parameters.
6. Check operation of control valves.
7. Check for water leaks.
8. Check drip trays and internal drain lines for blockages and clear.
9. Check operation of controls and calibrate as necessary.
10. Check operation of interlocks in use.
11. Final check on overall operation of unit.
12. Indicate on report any faults found or causes for concern.
Frequencies recommended are as follows:
Filters may need more frequent inspection.
In order to comply wi European Union F-Gas regulations, it is necessary to
leak test hermetically sealed systems wi more an 6kg refrigerant annually.
The operator of e unit is responsible for seeing at is test is carried out.
Delta machines from Delta 6 upwards need to have is annual test.
Model Light/Medium use Heavy use
Delta 1 to 12 2 visits per year 4 visits per year
Delta 14 and 16 3 visits per year 4 visits per year
4.1 MAINTENANCE
Bekijk gratis de handleiding van Calorex Delta DT 12, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Calorex |
| Model | Delta DT 12 |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 13120 MB |






