Broan HRV90S handleiding

40 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 8 van 40
4. INSTALLATION (CONTD)
4.4 INSTALLING THE DUCTWORK AND REGISTERS (CONTD)
4.4.3 S
IMPLIFIED INSTALLATION (AS ILLUSTRATED IN SECTION 3.3)
8
When performing duct connections, always use approved tools and materials. Respect all corresponding
laws and safety regulations. Please refer to your local building code.
WARNING
!
When performing duct connections to the furnace supply duct (Method 1), this duct must be sized to
support the additional airflow produced by the unit. Also, the use of metal duct is highly recommended.
For a Return-Return installation, the furnace blower must be in operation when the unit is in operation.
CAUTION
There are 2 methods for connecting the unit to the furnace/air handler:
Method 1: Supply-Return Connection Method 2: Return-Return Connection
VJ0077
A
B
MINIMUM 18
M
ETAL DUCT
A+B = NOT LESS
THAN 10
VJ0078
B
A
A+B = NOT LESS
THAN 10
MINIMUM 3’
Stale air intake
Cut an opening into the furnace return duct not less than 10 feet from the furnace/air handler (A+B).
Connect this opening to the Exhaust air from building port of the unit.
Fresh air distribution
Same instructions as for Method 1 or Method 2, Section 4.4.2.
For Method 2 (Return-Return), make sure there is a distance of at least 3 feet between the 2 connections to the furnace/air
handler.
If using Method 2, make sure the furnace/air handler blower operation is synchronized with the unit
operation! See Section 6 Electrical Connection to the Furnace.
CAUTION
NOTE: For Method 1, it is not essential to synchronize the furnace blower operation with the unit operation, but we recommend it.

Bekijk gratis de handleiding van Broan HRV90S, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkBroan
ModelHRV90S
CategorieAirco
TaalNederlands
Grootte7602 MB