Broan ERV200TE handleiding

56 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 10 van 56
10
3. INSTALLATION (CONTD)
3.5 INSTALLING THE DUCTWORK AND REGISTERS (CONTD)
3.5.3 SIMPLIFIED INSTALLATION
There are 2 methods for connecting the unit to the furnace/air handler:
Method 1: Supply-return connection Method 2: Return-return
WARNING
!
When performing duct connections, always use approved tools and materials. Respect all corresponding laws and
safety regulations. Please refer to your local building code.
CAUTION
When performing duct connections to the furnace supply duct (Method 1), this duct must be sized to support the
additional airflow produced by the unit. Also, the use of metal duct is highly recommended. For a Return-return
installation, the furnace blower must be in operation when the unit is in operation.
VJ0130
A
B
METAL DUCT
A+B = NOT LESS
THAN 10
MINIMUM 18"
B
A
VJ0131
MINIMUM 3'
A+B = NOT LESS
THAN 10
Stale air intake
Cut an opening into the furnace/air handler return duct not less than 10 feet from the furnace/air handler (A+B).
Connect this opening to the Exhaust air from building port of the unit.
Fresh air distribution
Same instructions as for Method 1 or Method 2, Section 3.5.2.
For Method 2 (Return-return), make sure there is a distance of at least 3 feet between the 2 connections to the furnace/air handler.
NOTE: For Method 1, it is not essential to synchronize the furnace blower operation with the unit operation, but we recommend it.
CAUTION
If using Method 2, make sure the furnace/air handler blower operation is synchronized with the unit operation!
See Section 5.

Bekijk gratis de handleiding van Broan ERV200TE, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkBroan
ModelERV200TE
CategorieAirco
TaalNederlands
Grootte7524 MB