Bradley S19274E handleiding

35 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 13 van 35
13
Installation S19-270C, S19-270E, S19274C, S19274E
Bradley • 215-1326 Rev. V; ECN 15-05-042 10/5/2017
Assembly of Components and Parts List S19274E
P.O. Box 309, Menomonee Falls, WI 53051
R
TEST THIS UNIT EACH WEEK
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date Signed
Signed
Signed
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
bradleycorp.com
114-051
Eye/Face Wash Cover
Prepack S45-2676 includes
items 22, 24a and 24b
22
22
24a
24b
1 N/A 1 Valve not available for service; must
replace complete fixture.
2 160-473 2 Screw, Set
13 160-474 2 Screw, Set
14 113-514 1 Shank, ½" x 2½"
15 142-002CB 1 Washer, Flat ⁷⁄₈" x 2"
16 110-115 1 Nut, Brass ½"-14 NPSM
19 113-1075 1 Pipe, ³⁄₈" x 9" Chrome Red Brass
20 171-005 1 Body, Mount, Short ³⁄₈" NPT
21 S05-192 1 Sprayhead Ass'y Eye/Face Wash (incl.)
22 in service kit 2 Pivot Pin
24a in service kit 1 Flip Cover, Right
24b in service kit 1 Flip Cover, Left
25 115-169 1 Cap, Short
26 125-157 2 O-Ring
27 125-175 1 Flow Control
29 160-500 1 Screw, Weep
30 114-051 1 Safety Sign
31 204-421 1 Emergency Inspection Tag
Item Part No. Qty Description
Item Part No. Qty Description
21
Right-hand swivel version is shown in the "ON" position.
24a
24b
27
1
14
15
16
19
30
31
2
13
Deck
25
20
26
22
29

Bekijk gratis de handleiding van Bradley S19274E, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkBradley
ModelS19274E
CategorieNiet gecategoriseerd
TaalNederlands
Grootte6074 MB