Blodgett BCT-101G handleiding

62 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 11 van 62
9
INSTALLATION
Stacking - 61, 62, 101, 102
STEPS 4-8 ARE FOR GAS OVENS ONLY. For electric ovens, proceed to step “Lift the top oven o󰀨 the pallet. Place
corrugated cardboard blocks over forks of the lifting mechanism. DO NOT LIFT FROM BOTTOM OF THE OVEN! Be
aware that the oven is heavier on the control side and may tip in that direction. Adjust lift arm position accordingly.”
on page 12.
4. Install ue pipe as follows:
a. Install clamp collar onto ue pipe oven end.
b. Position dense piece of insulation underneath ue pipe as shown in photo.
c. Secure ue pipe to the oven body top with hex head machine screws.
Figure 5
5. Install gas ue pipe cover as follows:
a. Remove the hex head screws from the top body panel
b. Use the screws to attached the ue pipe cover to install the ue pipe cover.
Figure 6

Bekijk gratis de handleiding van Blodgett BCT-101G, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkBlodgett
ModelBCT-101G
CategorieNiet gecategoriseerd
TaalNederlands
Grootte25110 MB