Bezzera BZ13 handleiding

64 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 25 van 64
25
MOD. BEZZERA BZ13 - CREMA
3 - MACHINE DESCRIPTION
3.1 Description of working cycle
The water coming from the tank on the back of the machine, via a pump, passes through a over
pressure valve regulated to 12 bar (1.2 MPa) and allows the boiler and the exchanger to be loaded.
The boiler water, heated up through a resistor, heats up the exchanger water from which, thanks to
a dip pipe, is convoyed to the group in order to brew the coffee by means of a valve electronically
controlled.
3.2 Description of controls
(Fig. 01 - Fig. 10)
1 Main switch
2 Green light
(PM)
2a Red light (
DEPID-PMPID
)
3 Yellow light
(PM)
4 a Coffee distribution button (PM
-PMPID
)
4 b Coffee distribution buttons
DEPID
)
4 c Coffee button LEDs (
DEPID
)
5 Distribution unit
6 Filter holder
7 Water tap
8 Hot water distributor
9 Steam tap
10 Steam nozzle
11 Gauge 0-15 bar (
DEPID-PMPID
)
11a Gauge dual scale (PM)
11b PID (
DEPID-PMPID
)
12 Electrical power cable
13 1 cup filter
14 2 cup filter
15 Blind filter
3.3 Technical data
(Fig. 02)
Power supply V~/Hz 220 – 240V~ / 50-60Hz 110 – 120V~ / 50-60Hz
Nominal power W 1400
Resistance W 1200
Boiler lt 1,5
Tank (S) lt 3
Width «A» mm 250
Depth «B» mm 450 (CREMA 467)
Height «C» mm 375
Net weight kg 19
Gross weight (box) kg 22

Bekijk gratis de handleiding van Bezzera BZ13, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkBezzera
ModelBZ13
CategorieNiet gecategoriseerd
TaalNederlands
Grootte5975 MB