Axis AX-GPC-2 handleiding

23 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 12 van 23
11
ENGLISH
EN
8.5. Inspection
Before commissioning, the system must be tested
in order to evaluate the operating conditions of
each individual component and identify any
anomalies.
To carry out testing, carry out the following
checks:
1. Open the gas supply valve and check the
sealing of the connections;
2. Check that burner ignition and
combustion is regular;
3. Check and, if necessary, regulate the gas
pressure and flow rate at the minimum
(see specific chapter)
4. Check that there are no gas leaks;
8.6. Power Supply Transformation
The appliance has been tested by the
manufacturer with the gas shown on the features
plate. If the type of gas to be connected is
different from the gas used in testing, proceed as
follows.
1. Close the gas supply cock (A).
2. Replace the burner nozzle (see specific
chapter)
3. Replace the pilot light nozzle (see specific
chapter).
4. Regulate the minimum on the burner gas
cock (see specific chapter).
5. Remove the adhesive applied to the data
pate and apply the new one to highlight
the gas in use.

Bekijk gratis de handleiding van Axis AX-GPC-2, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkAxis
ModelAX-GPC-2
CategorieNiet gecategoriseerd
TaalNederlands
Grootte3424 MB