Avantco CDIM-18 handleiding
Handleiding
Je bekijkt pagina 3 van 3

3
User Manual
www.AvantcoIce.com
Countertop Dry Ice Machine
CONNECTING CO
2
CYLINDER
NOTE: When the machine does not make a complete dry ice block, this is an
indication that it is time to change the cylinder.
NOTE: We recommend using a 20 lb. or larger CO
2
tank with this machine for
optimal results.
1. Close the shut o valve of the CO
2
cylinder.
2. Press the head of the glass froster until all excess pressure is released.
3. Loosen the nut on the CO
2
cylinder and remove the CO
2
cylinder.
4. Replace it with a full CO
2
cylinder.
5. Place steel wire for the connection hose around the CO
2
tank.
6. Add rubber seal rings to the inside of the connection hose nut, then connect
to CO
2
tank.
7. Tighten by hand. Then, use a wrench to finish tightening.
NOTE: Do not overtighten.
8. Slowly open CO
2
tank, ensuring there are no leaks in the system. Then, fully
open CO
2
tank.
9. Press down on the glass froster head to ensure equipment is operational.
Troubleshooting
Problem Possible Solution
Long frosting time. Replace the CO
2
tank with a full tank.
Not frosting at all. Replace the CO
2
tank with a full tank.
Bekijk gratis de handleiding van Avantco CDIM-18, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Avantco |
Model | CDIM-18 |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 738 MB |