Asus PE1000S handleiding

84 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 54 van 84
54
PE Series
To install a 5G NR module:
1. Follow steps 1-2 in the Installing memory modules section to access
the M.2 B-key slot.
2. Remove the screw from the M.2 standoff.
3. If the standoff is already seated in the right mounting hole to fit your
module, skip to step 5.
4. Unscrew the standoff, and install it to a mounting hole that matches
the length of your module.
NOTE: We recommend using a PH1/sleeve screwdriver with a torque of
2.0±0.2kgf-cm when tightening the standoff.
5. Align and insert the module into the slot.
6. Press down, and then secure it in place using the screw previously
removed.
NOTE: We recommend using a PH1 screwdriver with a torque of
2.0±0.2kgf-cm when tightening the screw.
7. (Optional) Connect the RF cables from the antennas to your module.
Make sure that the correct cable is attached to each of the connectors
by following chart on the next page.
WARNING! RF modules are intended for OEM or host integrators only.
For availability of system level RF certification, check with your OEM
integrator.

Bekijk gratis de handleiding van Asus PE1000S, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkAsus
ModelPE1000S
CategorieNiet gecategoriseerd
TaalNederlands
Grootte4672 MB