Alto-Shaam QC3-3 handleiding

61 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 10 van 61
10 MN-38954 • Rev 0 • 04/17 • Quickchillers
Installation
QC3-100 Bottom View
Water Drainage
A 1" NPS drain is located under the QC3-100. Connect
the drain pipe using Teon tape to discharge through an
indirect waste pipe into an open-site drain by means of a
2"(51mm) air gap. Connection must be within 10' (3m) of
the Quickchiller.
NOTICE: In the U.S.A., this equipment is to be installed
to comply with the Basic Plumbing Code of
the Building Ofcials and Co de Administrators
International, Inc. [BOCA], and the Food
Service Sanitation Manual of the Food & Drug
Administration [FDA].
15-1/2" (394mm)
Hinged Left
35-1/2" (902mm)
Hinged Right
17-5/8" (447mm)
Front
Drainage
QC3-3 QC3-20 QC3-40
Evaporator Pan: No installation required
QC3-100
One (1) Floor Drain:
1/2" 12,7mm Diameter
Drain
It is recommended that legs be attached to the
Quickchiller before installing drain assembly.
How to install legs on QC3-100
1. Avoiding trolley guides and drain, carefully lift
Quickchiller off of oor with forklift just high enough to t
leg assembly (1) and tools.
2. Pound feet (2) into frame (1).
3. Align frame with holes on the bottom of the Quickchiller.
Insert screws (4) through nut inserts (3) and attach to
frame using a 3/8" socket.
4. Adjust feet accordingly to level the Quickchiller.
1
1
2
2
4
3
19mm 19mm
51mm51mm
Leg Assembly (5016746)
Item Part Description Qty.
1 5016745 Frame, Legs 2
2 FE-23822 Feet, Adjustable, Flanged 4
3 NU-24613 Nut, Insert 1/4-20 12
4 SC-25286 Screw, 1/4-20 x 3/4" Flanged Head 12

Bekijk gratis de handleiding van Alto-Shaam QC3-3, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkAlto-Shaam
ModelQC3-3
CategorieKoelkast
TaalNederlands
Grootte9903 MB