Alto-Shaam 1000-SK handleiding
Handleiding
Je bekijkt pagina 38 van 100

INSTALLATION
Delux e C ont rol Cook & H o l d ▪ O p er a tor’s Ma n u al ▪ M N-46708 ▪ R ev 1 ▪ 1/ 2 1
38
How to Stack Two Ovens
Before you begin Make sure you have:
▪ Industrial-grade silicone RTV
▪ An appropriate lifting device, and enough personnel, to safely move and position
the weight of the oven.
□ 500-TH/SK: 185 lb (84 kg)
□ 750-TH/SK: 225 lb (102 kg)
□ 1000-TH/SK: 250 lb (113 kg)
Procedure To stack the ovens, do the following.
Step Action
1. Remove all packing material from each oven.
2. Install the stacking kit to the bottom oven using the screws from the kit.
3. Remove the casters from the upper oven if required.
4. Using an appropriate lifting device, lift the upper oven and set it on the
bottom oven. Secure the upper oven to the bottom oven using the screws
from the kit. Apply a bead of silicone RTV on the three upper edges of the
stacking kit panel.
Result The ovens are now stacked.
TH-TS-011313
Lo
RTV
Bekijk gratis de handleiding van Alto-Shaam 1000-SK, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Alto-Shaam |
Model | 1000-SK |
Categorie | Oven |
Taal | Nederlands |
Grootte | 13713 MB |