Alto-Shaam 1000-SK-II handleiding

44 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 13 van 44
MN-29756 (Rev. 4) 10/16 • TH-SK Series Cook, Hold, Smoke • 11
SITE INSTALLATION
INSTALLATION
Stacking Instructions
1) If the two appliances were shipped together from the factory, the top unit will have the casters already removed.
A stacking kit will be included with the shipment.
If casters need to be removed, lay the unit on its back, and using a rubber or non-marring hammer, tap on the top
and underside of the caster, alternating sides, until the caster slides out.
2) While appliance is laid on its back, insert one stacking post in each of the four corners of the
upper unit. Secure the stacking posts using one screw and two  at washers that come with the stacking kit. Use
template 68696 to locate set screw hole. Drill with #30 Bit and Tap 8-32.
NOTE: The  ange on the stacking posts must face the outside of the unit.
3) Remove the four top mounting screws from the lower unit. Place the upper appliance, which has the stacking
posts installed, on top of the bottom unit. Center the top unit from front to back.
Re-install the four screws through the  ange of the four stacking posts.
DETAIL A
STACKING KIT 5004864
CASTER SET SCREW
TOP MOUNTING SCREW
A
Stacking Configurations
Model Can be stacked with:
500-TH-II 500-TH/III, 500-TH-II or 500-S
750-TH-II or 767-SK 750-TH/III, 750-TH-II, 750-S, 767-SK, 767-SK/III, XL-300 or XL-400
1000-TH-II or 1000-SK/II 1000-TH/III, 1000-SK/III, 1000-SK/II, 1000-S or XL-300
Stacking Configurations

Bekijk gratis de handleiding van Alto-Shaam 1000-SK-II, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkAlto-Shaam
Model1000-SK-II
CategorieOven
TaalNederlands
Grootte7268 MB