Airlive ONU-10XGS-1004-10G handleiding
Handleiding
Je bekijkt pagina 10 van 70

AirLive ONU-10XG(S)-1004-10G User Guide
7
4. Check all signal levels and services on all the ONU communication ports.
Unit Installation Adjustment
Installing the ONU on a horizontal surface (Bench top)
Put the ONU on a clean, flat, sturdy bench top. You must keep the clearance for all
sides of the unit to more than 10cm for heat dissipation.
Installing the ONU on a vertical surface (Hanging on a wall)
You can install the ONU on a vertical surface by using the mounting holes on the bottom
of the ONU chassis and two flat-head wood screws.
a) Insert the screws into the wall. The screw positions must be in the same horizontal line
and the distance between them must be 165mm. Reserved at least 6mm between the
screw caps and the wall.
b) Hang the ONU on the screws through the mounting holes.
2.3 Set up Connection
Set up wired connection
Connect PC with ONU Ethernet port by RJ-45 CAT 5/CAT6A cable.
Bekijk gratis de handleiding van Airlive ONU-10XGS-1004-10G, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Airlive |
| Model | ONU-10XGS-1004-10G |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 7471 MB |







