AGM Secutor Pro TS50-640 handleiding

48 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 12 van 48
12 AGM Global Vision
2 OPERATING INSTRUCTIONS
2.1. BASIC OPERATIONS
2.1.1 UNPACKING
The following steps must be completed prior to each mission.
1. Open the carrying case, remove the device, and verify that all
components are included.
2. Inspect the device for any obvious evidence of damage to the
optical surfaces, body, eyecup, operation buttons, etc. Ensure
that all optical surfaces are clean and ready for use. Clean all
optical surfaces with a lens tissue.
2.1.2 CHARGING THE BUILT-IN BATTERY
When the device is turned on, the OSD (on-screen display) shows the
battery status. Icon
means the battery is fully charged, and icon
means that the battery is low.
When the low power note shows, charge the battery.
NOTE:
Please charge the battery with the delivered USB cable and power
adapter. The charging temperature should be 0°C to 45°C (32°F to
113°F).
FIGURE 2-1. USB INTERFACE
A
C
D
B

Bekijk gratis de handleiding van AGM Secutor Pro TS50-640, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkAGM
ModelSecutor Pro TS50-640
CategorieNiet gecategoriseerd
TaalNederlands
Grootte3705 MB