Advantech SKY-MXM-T1000 handleiding

22 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 16 van 22
SKY-MXM-T1000 User Manual 10
2.1 Power Sequencing
There is no power sequencing requirement for the input voltages to the MXM mod-
ule. However the PWR_EN signal may be asserted only after all power rails are
within specified tolerances. The state of PWR_GOOD is undefined until all the rails
are fully ramped. Refer to Figure 2.1 for details.
Figure 2.1 Power Sequencing
Table 2.1: Signals Exempted
Group Signals
Power and Thermal SMB_CLK, SMB_DAT, TH_OVER#, TH_ALERT#, PWR_GOOD
System Management WAKE#, PEX_CLK_REQ#
Display DP_x_HPD, LVDS_x_HPD
Note! No voltage shall be applied to any MXM module signal pin (except
power pins and open drain signals specified in Table 2.1) until PWR_-
GOOD is asserted.

Bekijk gratis de handleiding van Advantech SKY-MXM-T1000, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkAdvantech
ModelSKY-MXM-T1000
CategorieNiet gecategoriseerd
TaalNederlands
Grootte1845 MB