Adj MDF2-9SYS handleiding
Handleiding
Je bekijkt pagina 17 van 36

17
PANEL SET UP INSTRUCTIONS
INSTALLATION INSTRUCTIONS
9. Once all panels have been placed, install the unpowered edge ramps around the remaining
edges of the panel assembly using the docking magnets and the connection brackets.
10. Slot the corner ramps in place at each corner of the panel assembly. It can be helpful to lift both
adjacent edge ramps slightly in order to align the corner ramp, the edge ramps, and the connec-
tion bracket. Once aligned, the three ramp pieces should fall easily into place.
One of the corner ramps includes a small cutout for the power cable and DMX line, and may be
used at the corner where the cables run out from the row of power supply ramps. Alternately, this
corner may simply be left open.
INSTALLATION COMPLETE!
Bekijk gratis de handleiding van Adj MDF2-9SYS, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Adj |
Model | MDF2-9SYS |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 8731 MB |