Adj AV2XS handleiding

25 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 21 van 25
21
INSTALLATION - STACKED
Adding instruction for rigging bar stacked assembly.
Align the vertical positional posts with their corresponding alignment holes and insert them.
The vertical tab-keyed connector is spring loaded. Press locking latch lever while pressing vertical
key-tabbed connector into matching tab-keyed hole of locking-latch, then release latch to lock the
vertical connector.
To tighten the vertical connector, twist lever from the right to the left (clockwise).

Bekijk gratis de handleiding van Adj AV2XS, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkAdj
ModelAV2XS
CategorieNiet gecategoriseerd
TaalNederlands
Grootte19320 MB